Olympic Stadium

Berlin, Germany
Photo © Heiner Leiska

The master plan proposed by Werner March in 1936 remains under urban historic preservation. All additions have been placed underground, outside of the stadium. The new roof structure with its open-ended ring towards the Marathon Gate sets itself apart from stadium typology with its simple construction and choice of surface material. The roof is designed as a light cantilevering steel construction with an upper and lower membrane. From the interior, the roof rests on 20 steel columns, which each have a slim profile of 25 cm in diameter.

Brief
Reconstruction and Roofing

Competition
1998 – 1st prize

Design
Volkwin Marg and Hubert Nienhoff

Client
City of Berlin

Construction period
2000–2004

Seats
76.000

Photo © Heiner Leiska
Photo © Fritz Bussam
Photo © Heiner Leiska
Photo © Heiner Leiska
Drawing © gmp
Drawing © gmp
Architects
gmp · von Gerkan, Marg and Partners Architects
Location
Hanns-Braun-Straße, 14053 Berlin, Germany
Year
2004

Related Projects 

  • Five Camphor Courtyard
    Parallect Design
  • Kindergarten Müllerwis
    Walo Bertschinger AG | Bodenbeläge
  • Lanserhof Sylt
    TROPP LIGHTING DESIGN
  • Fire Station Zeven
    abj Architekt:innen GmbH
  • Umbau / Sanierung Wohnhäuser in Emmenbrücke
    GKS Architekten AG

Magazine 

Other Projects by gmp · Architekten von Gerkan, Marg und Partner 

Kunshan Olympic Sports Center
Kunshan, China
Estádio Mineirão
Belo Horizonte , Brazil
Guna Villa
Jumrala, Latvia
Hanoi Museum
Hanoi, Vietnam
Arena da Amazônia
Manaus, Brazil