Baku Crystal Hall

Baku, Azerbaijan
Photo © Florian Licht

Just in time for the Eurovision Song Contest 2012, the Baku Crystal Hall - a modern, multi-functional event arena with a capacity of 23,000 spectators - could be completed in a record time of only eight months. The 206-metre-long and 168-metre-wide steel construction is clad with an illuminated membrane facade, which lends the building its characteristic crystalline appearance. During the dark hours the majestic hall’s facade is lit by 5,400 LED RGB light points that make a great visual impact.

Architect
gmp Architekten

Awards
IES Illumination Award of Merit 2013
illumni Infinity Awards 'Bronze' for facade lighting
IES Illumination Awards 2013 – Section Award
LAMP Lighting Solution Awards 13 – Shortlisted: Architectural outdoor lighting

Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht

Other Projects by Lichtvision Design 

Garden Conservatory
Seoul, South Korea
Kö-Bogen
Dusseldorf, Germany
Terminal 4 Singapore Changi Airport
Singapore, Singapore
PCK Refinery
Schwedt, Germany
Changzhou Culture Plaza
Changzhou, China